Sign In | Join Free | My components-electronic.com
China Jiangsu Hongbao Group Co., Ltd. logo
Jiangsu Hongbao Group Co., Ltd.
Jiangsu Hongbao Group Co., Ltd. Manufacture since 1958
Verified Supplier

8 Years

Home > Precision Steel Tube >

ST52 Q345B Seamless Precision Steel Tube, Auto Parts Large Diameter Steel Tube

Jiangsu Hongbao Group Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

ST52 Q345B Seamless Precision Steel Tube, Auto Parts Large Diameter Steel Tube

  • 1
  • 2

Brand Name : Hongbao

Model Number : HBPST-1

Certification : TS16949, DNV, PED, ISO, TUV, LR

Place of Origin : Jiangsu, China

MOQ : 1 ton

Price : Negotiable

Supply Ability : 30000MT per year

Delivery Time : Within 50 days if production

Packaging Details : seaworthy plywooden case packing.

Payment Terms : L/C, T/T

Origin : Jiangsu,China

OD : 6-120mm

Thickness : 0.5-15mm

Shape : Round

Type : Welded or Seamless

Processing : Cold Drawn, Cold Rolled

Contact Now

ST52 Q345B Cold Drawn Precision Steel Tube Round Cold Drawn Honed Tubes For Auto

Description:

Our ST52 Q345B cold drawn precision steel tube is a high-stength, precision-crafted round tube for automotive applications. Cold drawn and honed for exacting tolerances, this tube features excellent dimensional stability, high tensile strength and smooth inner surfaces. Ideal for use in engine mounts, suspension components and other critical auto parts where reliability and performance are paramount.

Delivery

Conditions

1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N)

After the final cold forming process the tubes are annealed above the upper transformation

point in a controlled atmosphere.

Package 1. Bundle Packing.
2. Plain end or vanished as per customer's request.
3. Wrapped in waterproof paper.
4. Sackcloth with several steel strips.
5. Pack in heavy tri-wall boxes.

Quality Control:

1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking.

ST52 Q345B Seamless Precision Steel Tube, Auto Parts Large Diameter Steel Tube


Product Tags:

precision steel pipe

      

erw precision tubes

      
Buy cheap ST52 Q345B Seamless Precision Steel Tube, Auto Parts Large Diameter Steel Tube product

ST52 Q345B Seamless Precision Steel Tube, Auto Parts Large Diameter Steel Tube Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jiangsu Hongbao Group Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)